![](/images/NTI0MXgweDU1MA==/00587_01%281%29.jpg)
![](/images/NTI0MngweDU1MA==/00587_02%281%29.jpg)
![](/images/NTI0M3gweDU1MA==/00587_03%281%29.jpg)
![](/images/NTI0NHgweDU1MA==/00587_04%281%29.jpg)
![](/images/NTI0NXgweDU1MA==/00587_05.jpg)
![](/images/NTI0NngweDU1MA==/00587_06.jpg)
![](/images/NTI0N3gweDU1MA==/00587_07.jpg)
![](/images/NTI0OHgweDU1MA==/00587_08.jpg)
![](/images/NTI0OXgweDU1MA==/00587_09.jpg)
![](/images/NTI1MHgweDU1MA==/00587_10.jpg)
![](/images/NTI1MXgweDU1MA==/00587_11.jpg)
- location:
- Brno-Královo Pole
- client:
- STEMFIRE, s. r. o.
- authors:
- Jiří Knesl, Jakub Kynčl, Štěpán Vašut
- project phase:
- dokončeno
- project period:
- 2016–2020
- building period:
- 2021-2022
- project site:
- 2 489 m2
- build-up area:
- 922 m2
- floor area:
- 2 487 m2
- build-up space:
- 11 200 m3